SCHROEDER ROAD over HIGH LINE CANAL
5.5 S. 2.8 W. ABERDEEN · County 011, Idaho · Built 1965 · 2 Lanes · 130 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.862908, -112.887775
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
MOSER ROAD over HIGH LINE CANAL
Built 1975
GAMBLE 2200 S over HIGH LINE CANAL
Built 1987
S1720;N PLSNT VLY over ABERDEEN SPRINGFIELD CNL
Built 2014
SH 39 over HEGE DRAIN
Built 1962
FAIRVIEW RD over WASTEWAY CANAL
Built 2021
HOMESTEAD ROAD over HIGH LINE CANAL
Built 1987
CEDAR LN over WASTEWAY CANAL
Built 1995
HUNSNGR LP;W.2050S over HIGH LINE CANAL
Built 1977
FAIRVIEW RD;S2900W over HIGH LINE CANAL
Built 1975
STC 1832;2000 S RD over HIGH LINE CANAL
Built 2010
Bridge Details
- Structure #
- 000000000022540
- Year Built
- 1965
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $208,000
- Total Project Cost
- $312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.