N 800 W; PERKS RD over PEOPLES CANAL
1.1 N. 0.6 W. MORELAND · County 011, Idaho · Built 1966 · 2 Lanes · 95 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.238883, -112.454831
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
US 26 over PEOPLES CANAL
Built 2018
US 26 over ABERDEEN CANAL
Built 2020
STC 1829; 200 N over ABERDEEN SPRINGFIELD CNL
Built 1989
STC 1829; PARKS RD over DRAIN DITCH
Built 1989
LEMHI ROAD over ABERDEEN SPRINGFIELD CNL
Built 1994
STC 1829; W 200 N over PEOPLES CANAL
Built 1989
LEMHI ROAD over PEOPLES CANAL
Built 1994
N 900 W over PEOPLES CANAL
Built 1978
N 900 W over ABERDEEN SPRINGFIELD CNL
Built 1978
CLARK ROAD over ABERDEEN SPRINGFIELD CNL
Built 1972
Bridge Details
- Structure #
- 000000000022525
- Year Built
- 1966
- Reconstructed
- 2020
- Length
- 18 m (59.1 ft)
- Max Span
- 17.4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 95
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $270,000
- Total Project Cost
- $405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.