FINGAL ROAD over LOW LINE CANAL

1.5N. 0.4W. ABERDEEN · County 011, Idaho · Built 1968 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000022520
Year Built
1968
Length
10.4 m (34.1 ft)
Max Span
10.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.