EXPERIMENT ROAD over LOW LINE CANAL
3.2S. 0.5E.ABERDEEN;2700W · County 011, Idaho · Built 1958 · 2 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.897272, -112.831083
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 68 years old.
Nearby Bridges
HOMESTEAD ROAD over LOW LINE CANAL
Built 1958
FUNK ROAD over LOW LINE CANAL
Built 1958
1900 SOUTH ROAD over LOW LINE CANAL
Built 1958
2700 WEST ROAD over LOW LINE CANAL
Built 1977
SH 39 over HEGE DRAIN
Built 1962
FAIRVIEW RD;S2900W over HIGH LINE CANAL
Built 1975
STC 1832;2000 S RD over HIGH LINE CANAL
Built 2010
FAIRVIEW ROAD over HIGH LINE CANAL
Built 1971
2750 WEST ROAD over LOW LINE CANAL
Built 1965
HUNSNGR LP;W.2050S over HIGH LINE CANAL
Built 1977
Bridge Details
- Structure #
- 000000000022515
- Year Built
- 1958
- Length
- 11.9 m (39 ft)
- Max Span
- 11.3 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $268,000
- Total Project Cost
- $402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.