ARMY WAY over ABERDEEN SPRINGFIELD CNL
1.0 N. 3.7 W. RIVERSIDE · County 011, Idaho · Built 1963 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.212356, -112.509486
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
ARMY WAY ROAD over PEOPLES CANAL
Built 1963
SH 39 over PEOPLES CANAL
Built 2018
STC 1844;HOFF ROAD over ABERDEEN SPRINGFIELD CNL
Built 1990
N 900 W over ABERDEEN SPRINGFIELD CNL
Built 1978
N 900 W over PEOPLES CANAL
Built 1978
THOMAS ROAD over PEOPLES CANAL
Built 1971
W 50 S over ABERDEEN SPRINGFIELD CNL
Built 1984
STC 1829; W 200 N over PEOPLES CANAL
Built 1989
STC 1829; PARKS RD over DRAIN DITCH
Built 1989
STC 1829; 200 N over ABERDEEN SPRINGFIELD CNL
Built 1989
Bridge Details
- Structure #
- 000000000022470
- Year Built
- 1963
- Length
- 29.6 m (97.1 ft)
- Max Span
- 14.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $655,000
- Total Project Cost
- $983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.