MONROE RD;E 1000 N over RESERVATION CANAL
1.6 N. BASALT · County 011, Idaho · Built 1984 · 1 Lanes · 110 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.340439, -112.162953
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 42 years old.
Nearby Bridges
1000N-680E; MONROE over BLACKFOOT CANAL
Built 1990
US 91 over CEDAR POINT CANAL
Built 2004
FOUNDRY RD;E 1100N over RESERVATION CANAL
Built 1987
US 91 over RESERVATION CANAL
Built 2000
KINGS RD; N 500 E over GREAT WESTERN CANAL
Built 1976
FOUNDRY ROAD over W.BR.SNAKE R.VALLEY CNL.
Built 1983
STC 1843; E 800 N over RESERVATION CANAL
Built 2006
STC 1843; E 800 N over BLACKFOOT CANAL
Built 2006
STC 1843; FIRTH RD over SNAKE RIVER;FIRTH BRIDGE
Built 2003
BASELINE RD;1200 N over GREAT WESTERN CANAL
Built 2001
Bridge Details
- Structure #
- 000000000022370
- Year Built
- 1984
- Length
- 6.7 m (22 ft)
- Max Span
- 6.7 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 110
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $189,000
- Total Project Cost
- $284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.