SMA 7721;RIVERTON over I 15;RIVERTON ROAD GS
1.3 S. BLACKFOOT · County 011, Idaho · Built 1962 · 2 Lanes · 910 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.182186, -112.378483
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
I 15 NBL over BLACKFOOT RIVER
Built 1962
I 15 SBL over BLACKFOOT RIVER
Built 1962
SMA 7721; RIVERTON over BLACKFOOT RIVER OVERFLOW
Built 1964
I 15 NBL over W.BRIDGE ST.GS;UPRR OP
Built 1962
I 15 SBL over W.BRIDGE ST.GS;UPRR OP
Built 1962
SMA 7611;W. BRIDGE over SNAKE RIVER
Built 1936
STC 7631;SHILLING over BLACKFOOT RIVER
Built 1971
I 15 NBL over US 26;WEST BLACKFOOT IC
Built 1962
I 15 SBL over US 26;WEST BLACKFOOT IC
Built 1962
US 26 EBL & WBL over SNAKE RIVER;W.BLACKFOOT
Built 1965
Bridge Details
- Structure #
- 000000000021720
- Year Built
- 1962
- Length
- 77.4 m (253.9 ft)
- Max Span
- 15.2 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 910
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,848,000
- Total Project Cost
- $2,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.