SMA7316;HOLMES AVE over IDAHO CANAL
IN IDAHO FALLS;HOLMES AVE · County 019, Idaho · Built 1990 · 4 Lanes · 20,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.484761, -112.023947
This bridge is in worse condition than 32.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 36 years old.
Nearby Bridges
HIGBEE ST over BUTTE ARM CANAL
Built 2023
SMA 7406;17TH ST over IDAHO CANAL
Built 1969
EMERSON ST. over BUTTE ARM CANAL
Built 1956
SMA 7406;17TH ST over BUTTE ARM CANAL
Built 1959
STC 7486;12TH ST over IDAHO CANAL
Built 2020
STC 7117;9TH ST over IDAHO CANAL
Built 1951
21ST ST. over BUTTE ARM CANAL
Built 1955
SMA7316;HOLMES AVE over IDAHO CANAL
Built 1999
SOUTH BLVD over US 26 NB-SB;S.BLVD GS
Built 2001
S7286;JOHN ADAMS P over IDAHO CANAL
Built 2013
Bridge Details
- Structure #
- 000000000021440
- Year Built
- 1990
- Length
- 14.9 m (48.9 ft)
- Max Span
- 7.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 20,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $757,000
- Total Project Cost
- $1,136,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.