STP7343;ORCHARD ST over I 184B;ORCHARD ST GS

IN BOISE;ORCHARD ST. · County 001, Idaho · Built 1968 · 5 Lanes · 19,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021325
Year Built
1968
Length
43.3 m (142.1 ft)
Max Span
21.5 m
Width
23.4 m (76.8 ft)
Lanes
5
Daily Traffic
19,000
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,790,000
Total Project Cost
$2,685,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.