SMA 7124;E MAIN ST over LINDSAY CREEK
IN LEWISTON · County 069, Idaho · Built 1997 · 4 Lanes · 5,700 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
46.418211, -116.989353
This bridge is in worse condition than 30.6% of bridges in County 069. The average bridge in Idaho is 0 years old; this one is 29 years old.
Nearby Bridges
US 12 over CLEARWATER RIVER;BNRR
Built 1951
SMA7334;GUN CLB RD over LINDSAY CREEK
Built 1971
US 95 RAMP NBL over US 95R SBL;LEWISTON IC
Built 1977
US 95RAMP SB over US 12 WB; LEWISTON IC
Built 1977
US 12 over US 12;SNAKE RIVER
Built 1939
US 12 over SNAKE RIVER
Built 1939
SMA 7134;8TH ST. over BRYDEN CANYON ROAD
Built 1999
SNAKE RVR AVE RAMP over RAMP;SNAKE RIVER;HIGH BR
Built 1982
FLESHMAN WAY over SNAKE RIVER
Built 1982
SMA7344;BRYDEN CYN over SNAKE R;HIGH/SOUTHWAY BR
Built 1982
Bridge Details
- Structure #
- 000000000021291
- Year Built
- 1997
- Length
- 15.5 m (50.9 ft)
- Max Span
- 2.7 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 5,700
- Material
- Steel
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $767,000
- Total Project Cost
- $1,151,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.