STC6805;A-2 CLK CO over DRY CREEK

4 N. 7 E. KILGORE · County 033, Idaho · Built 1969 · 2 Lanes · 160 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

44.457889, -111.754333

This bridge is in worse condition than 23.1% of bridges in County 033. The average bridge in Idaho is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
000000000021090
Year Built
1969
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$243,000
Total Project Cost
$365,000