STC 6727;75TH EAST over ANDERSON CANAL
4.0 E. 0.3 N. UCON · County 019, Idaho · Built 1954 · 2 Lanes · 900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.598842, -111.884303
This bridge is in worse condition than 78.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 72 years old.
Nearby Bridges
STC 6719;E 113 N over ANDERSON CANAL
Built 1949
E. MILO ROAD over ANDERSON CANAL
Built 1963
COLTMAN RD;E 129 N over S.BRANCH HARRISON CANAL
Built 1957
N 85TH E over WILLOW CREEK
Built 1993
CANAL ROAD over RIRIE OUTLET CH WILLW CR
Built 1976
CANAL ROAD over SAND CREEK CHANNEL
Built 1976
US 26 over RIRIE OUTLET;WILLOW CRK
Built 2010
N 95TH E over WILLOW CREEK
Built 1945
55TH EAST ROAD over ANDERSON CANAL
Built 1954
E MILO ROAD over HARRISON CANAL
Built 1949
Bridge Details
- Structure #
- 000000000020855
- Year Built
- 1954
- Length
- 6.7 m (22 ft)
- Max Span
- 6.7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $312,000
- Total Project Cost
- $468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.