STC 6725; N55TH E over SAND CREEK
2.5 N. IONA · County 019, Idaho · Built 1953 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.562183, -111.924147
This bridge is in worse condition than 78.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 73 years old.
Nearby Bridges
N 45TH E over SAND CREEK
Built 1957
55TH EAST ROAD over NORTH FORK WILLOW CREEK
Built 1963
E 81ST N over SAND CREEK
Built 1991
N 45TH E over NORTH FORK WILLOW CR
Built 1958
US 26 over RIRIE OUTLET;WILLOW CRK
Built 2010
CANAL ROAD over RIRIE OUTLET CH WILLW CR
Built 1976
CANAL ROAD over SAND CREEK CHANNEL
Built 1976
FAIRVIEW RD;97TH N over ANDERSON CANAL
Built 1961
CEMETARY ROAD over ANDERSON CANAL
Built 1935
SH 43 over WILLOW CREEK
Built 1994
Bridge Details
- Structure #
- 000000000020850
- Year Built
- 1953
- Length
- 22.9 m (75.1 ft)
- Max Span
- 11 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $567,000
- Total Project Cost
- $850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.