STC 5770;WISCONSIN over PEND OREILLE RIVER

PREIST RIVER SCL · County 017, Idaho · Built 1956 · 2 Lanes · 5,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

48.174592, -116.909131

This bridge is in worse condition than 66.3% of bridges in County 017. The average bridge in Idaho is 0 years old; this one is 70 years old.

Nearby Bridges

Bridge Details

Structure #
000000000020615
Year Built
1956
Reconstructed
1988
Length
331.9 m (1088.9 ft)
Max Span
30.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
5,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$9,523,000
Total Project Cost
$14,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.