STC 5770;WISCONSIN over PEND OREILLE RIVER
PREIST RIVER SCL · County 017, Idaho · Built 1956 · 2 Lanes · 5,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
48.174592, -116.909131
This bridge is in worse condition than 66.3% of bridges in County 017. The average bridge in Idaho is 0 years old; this one is 70 years old.
Nearby Bridges
US 2 over PRIEST RIVER
Built 1962
STC 5783;PENINSULA over LOWER WEST BR. PRIEST R.
Built 1975
US 2 over PEND OREILLE R;OLDTOWN B
Built 1988
SH 41 over BURLINGTON NORTHERN RR
Built 2019
SR 41 over BNRR
Built 2019
US 2 over 87TH AVE SE
Built 1982
SH 57 over LOWER W.BRANCH PRIEST R.
Built 1936
STC 5783;PENINSULA over PRIEST R.;MC ABEE FALLS
Built 1961
Bridge Details
- Structure #
- 000000000020615
- Year Built
- 1956
- Reconstructed
- 1988
- Length
- 331.9 m (1088.9 ft)
- Max Span
- 30.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,523,000
- Total Project Cost
- $14,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.