STC4759;WEBB RD over SWEETWATER CREEK

2.0 SW SWEETWATER · County 069, Idaho · Built 1949 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000020250
Year Built
1949
Reconstructed
1990
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$353,000
Total Project Cost
$530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.