SMA 8803;6TH AVE over PAYETTE RIVER
0.1 S. PAYETTE WCL · County 075, Idaho · Built 1959 · 2 Lanes · 1,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.067664, -116.9396
This bridge is in worse condition than 95.4% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 67 years old.
Nearby Bridges
SH 52 over UPRR;PAYETTE OVERPASS
Built 1962
SH 52 over LOWER PAYETTE CANAL
Built 1992
1ST AVE S. over LOWER PAYETTE DITCH
Built 1967
STC8783;CENTER AVE over LOWER PAYETTE DITCH
Built 1967
STC 8743;7TH AVE N over LOWER PAYETTE DITCH
Built 2009
STC8843;NE 10TH AV over LOWER PAYETTE CANAL
Built 1960
US 95 over PAYETTE RIVER
Built 1968
SH 52 over SNAKE RIVER;PAYETTE BR.
Built 1953
OR 52 (HWY 492) over Snake River
Built 1953
OR 201 (HWY 455) over MALHEUR RIVER
Built 1976
Bridge Details
- Structure #
- 000000000019990
- Year Built
- 1959
- Length
- 123.1 m (403.9 ft)
- Max Span
- 20.4 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,885,000
- Total Project Cost
- $5,828,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.