SMA 9773;LINDER RD over BOISE RIVER;N. CHANNEL
0.7 S. 3.0 W. EAGLE · County 001, Idaho · Built 1992 · 2 Lanes · 22,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.688194, -116.413681
This bridge is in worse condition than 13.2% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 34 years old.
Nearby Bridges
SMA 9773;LINDER RD over BOISE R;MIDDLE CHANNEL
Built 1991
SH 44 over MIDDLETON CANAL
Built 1959
SALINA STREET over SEDONA CREEK
Built 2003
SMA 7030;STATE ST over DRY CREEK
Built 1959
TROUT ROAD over SEVEN SUCKERS DITCH
Built 1950
EAGLE ISLAND PKWY over BOISE RIVER
Built 2008
SMA 9773;LINDER RD over BOISE RIVER;S.CHANNEL
Built 1993
SMA 9773;LINDER RD over PHYLLIS CANAL
Built 1990
SH 44 over DRY CREEK
Built 1996
SH 16 over MIDDLETON CANAL
Built 1959
Bridge Details
- Structure #
- 000000000019796
- Year Built
- 1992
- Length
- 131.4 m (431.1 ft)
- Max Span
- 25.9 m
- Width
- 15.7 m (51.5 ft)
- Lanes
- 2
- Daily Traffic
- 22,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,220,000
- Total Project Cost
- $6,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.