STC2815;WARM SPRGS over WARM SPRINGS CREEK
2.6 W. KETCHUM · County 013, Idaho · Built 1955 · 2 Lanes · 560 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.682481, -114.419103
This bridge is in worse condition than 29.2% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 71 years old.
Nearby Bridges
ASPEN DRIVE over WARM SPRINGS CREEK
Built 1991
FDR over WARM SPRINGS CREEK
Built 1954
STC2815;WARM SPRNG over BIG WOOD RIVER
Built 1972
BROADWAY BLVD over BIG WOOD RIVER
Built 2001
ADAMS GULCH ROAD over BIG WOOD RIVER
Built 2018
SERENADE LANE over TRAIL CREEK
Built 1995
SECOND AVENUE over TRAIL CREEK
Built 1995
LEADVILLE AVE over TRAIL CREEK
Built 1980
BITTERROOT ROAD over TRAIL CREEK
Built 1965
HULEN MEADOWS ROAD over BIG WOOD RIVER
Built 1975
Bridge Details
- Structure #
- 000000000019555
- Year Built
- 1955
- Length
- 15.9 m (52.2 ft)
- Max Span
- 15.2 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 560
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $356,000
- Total Project Cost
- $535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.