STC 1718;ARBON VLY over BANNOCK CR.;MICHAUD BR.
15.6 N. PAULINE · County 077, Idaho · Built 1964 · 2 Lanes · 340 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.773992, -112.624686
This bridge is in worse condition than 8.5% of bridges in County 077. The average bridge in Idaho is 0 years old; this one is 62 years old.
Nearby Bridges
IRR BIA RTE 182 over BANNOCK CREEK
Built 1972
STC 1718;ARBON VLY over BANNOCK CR.;RATTLESNAKE
Built 1964
STC5695;RAMSEY RD over BANNOCK CREEK
Built 1954
ELEVATOR LOOP RD over BANNOCK CREEK
Built 2008
NEIBAUR ROAD over SUNBEAM CREEK
Built 1967
RAINBOW ROAD over I 86 EB-WB;RAINBOW RD GS
Built 1972
I 86 EBL over BANNOCK CREEK
Built 1972
E. COUNTY ROAD over BANNOCK CREEK
Built 1972
I 86 WBL over BANNOCK CREEK
Built 1972
IRR BIA RTE 187 over BANNOCK CREEK
Built 1971
Bridge Details
- Structure #
- 000000000019105
- Year Built
- 1964
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 340
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $300,000
- Total Project Cost
- $450,000