SH 200 over BNRR;LAKE PEND OREILLE

AT HOPE NWCL · County 017, Idaho · Built 1963 · 2 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000019050
Year Built
1963
Reconstructed
1975
Length
401.7 m (1317.9 ft)
Max Span
56.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
3,000
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,877,000
Total Project Cost
$20,817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.