SH 200 over BNRR;LAKE PEND OREILLE
AT HOPE NWCL · County 017, Idaho · Built 1963 · 2 Lanes · 3,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
48.250947, -116.315872
This bridge is in worse condition than 66.3% of bridges in County 017. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
SH 200 over STRONG CREEK;E.HOPE BR.
Built 1975
SH 200B over STRONG CREEK; E.HOPE BR.
Built 2019
SH 200 over TRESTLE CREEK
Built 2013
OLD SAM OWEN ROAD over THOMPSON PARK BNRR OP
Built 2008
US 2 over JOHNSON CREEK
Built 1970
FS ROUTE NO. 1082 over TRESTLE CREEK
Built 1969
SH 200 over PACK RIVER
Built 1978
SH 200 over BURLINGTON NORTHERN RR
Built 1966
FS ROUTE 489 over LIGHTNING CREEK
Built 1954
SUNNY SIDE ROAD over BNRR;KOOTENAI OP
Built 1994
Bridge Details
- Structure #
- 000000000019050
- Year Built
- 1963
- Reconstructed
- 1975
- Length
- 401.7 m (1317.9 ft)
- Max Span
- 56.1 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,000
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,877,000
- Total Project Cost
- $20,817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.