US 95 over PACK RIVER;N COLBURN BR.

2.2 N. COLBURN · County 017, Idaho · Built 1988 · 2 Lanes · 9,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000018740
Year Built
1988
Length
46.3 m (151.9 ft)
Max Span
44.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
9,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,329,000
Total Project Cost
$1,994,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.