US 95 over SALMON R.;MCKINZIE BR.

7.7 S. WHITEBIRD · County 049, Idaho · Built 1969 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000018350
Year Built
1969
Length
214.3 m (703.1 ft)
Max Span
56.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
2,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,155,000
Total Project Cost
$7,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.