US 95 over SALMON RIVER;GOFF BRIDGE

1.3 N. RIGGINS · County 049, Idaho · Built 1999 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000018331
Year Built
1999
Length
150.9 m (495.1 ft)
Max Span
121.9 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
2,200
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,500,000
Total Project Cost
$6,750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.