US 95 over LITTLE SALMON RIVER

12.2 S. RIGGINS · County 003, Idaho · Built 1962 · 2 Lanes · 2,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000018285
Year Built
1962
Reconstructed
1997
Length
67.1 m (220.1 ft)
Max Span
25.6 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,690,000
Total Project Cost
$1,859,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.