US 95 over I 84 EB-WB;US 95 IC

23.2 W. CALDWELL · County 075, Idaho · Built 1960 · 2 Lanes · 9,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000018095
Year Built
1960
Length
96.3 m (315.9 ft)
Max Span
22.7 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
9,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,772,000
Total Project Cost
$4,158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.