SH 75 over YANKEE FK OF SALMON RIVR

1.0 E. SUNBEAM · County 037, Idaho · Built 1934 · 2 Lanes · 680 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000017780
Year Built
1934
Length
61 m (200.1 ft)
Max Span
13.7 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
680
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,870,000
Total Project Cost
$2,792,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.