SH 75 over VALLEY CREEK

0.5 N. STANLEY · County 037, Idaho · Built 1977 · 2 Lanes · 680 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000017770
Year Built
1977
Length
33.8 m (110.9 ft)
Max Span
33.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
680
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$950,000
Total Project Cost
$1,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.