SH 75 over BIG WOOD RIVER

6.2 S. KETCHUM · County 013, Idaho · Built 2002 · 3 Lanes · 14,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000017666
Year Built
2002
Length
56.1 m (184.1 ft)
Max Span
26.5 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
14,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,622,000
Total Project Cost
$3,932,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.