SH 75 over BELLEVUE CANAL

4.4 S. HAILEY · County 013, Idaho · Built 1931 · 2 Lanes · 7,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000017650
Year Built
1931
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
7,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.