I 90RAMP EB OFF over PINE CREEK;EB OFF RAMP

5.1 W. KELLOGG · County 079, Idaho · Built 1977 · 1 Lanes · 630 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000017405
Year Built
1977
Length
37.8 m (124 ft)
Max Span
18.9 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
630
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,023,000
Total Project Cost
$1,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.