I 90 WBL over DIVISION STREET

IN KELLOGG · County 079, Idaho · Built 2023 · 2 Lanes · 5,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000017136
Year Built
2023
Length
50.3 m (165 ft)
Max Span
21.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
5,750
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.