I 90 over TIMOTHY LN;EVERGREEN GS

4.0E. 4.0S. COEUR DALENE · County 055, Idaho · Built 1992 · 4 Lanes · 18,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000016897
Year Built
1992
Length
64.3 m (211 ft)
Max Span
25.9 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
18,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,274,000
Total Project Cost
$4,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.