US 89 over UPRR;12TH ST.;MONTPELIER
IN MONTPELIER · County 007, Idaho · Built 1971 · 2 Lanes · 4,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.317489, -111.314383
This bridge is in worse condition than 41.2% of bridges in County 007. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
US 89 over BEAR RIVER
Built 1973
BERN ROAD over BEAR RIVER;BERN BRIDGE
Built 1973
US 89 over BEAR LAKE CANAL
Built 1973
US 89 over OVID CREEK
Built 2014
AIRPORT ROAD over BEAR RIVER
Built 1916
US 89 over OVID CREEK
Built 2019
US 89 over OVID CREEK
Built 2019
STC 1809;DINGLE RD over BEAR RIVER;N.DINGLE BR.
Built 1966
US 89 over MONTPELIER CK;LOWER NRWS
Built 2008
US 89 over MONTPELIER CK;UPPER NRWS
Built 2008
Bridge Details
- Structure #
- 000000000016705
- Year Built
- 1971
- Length
- 219.5 m (720.1 ft)
- Max Span
- 28 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,800
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,244,000
- Total Project Cost
- $9,366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.