I 84 over JUNIPER RD;GS NO.1
3.1 E. SUBLETT · County 031, Idaho · Built 1968 · 4 Lanes · 11,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.294642, -113.173228
This bridge is in worse condition than 86.3% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 58 years old.
Bridge Details
- Structure #
- 000000000016470
- Year Built
- 1968
- Reconstructed
- 1973
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 52.7 m (172.9 ft)
- Lanes
- 4
- Daily Traffic
- 11,000
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $284,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.