SH 78 over BROWN CREEK

5.6 W. HAMMETT · County 073, Idaho · Built 1954 · 2 Lanes · 880 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000015295
Year Built
1954
Length
18.9 m (62 ft)
Max Span
9.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
880
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000
Total Project Cost
$407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.