US 20 over SOLDIER CREEK

0.2 E. FAIRFIELD · County 025, Idaho · Built 1958 · 2 Lanes · 1,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000015050
Year Built
1958
Length
7.3 m (24 ft)
Max Span
7 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,900
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000
Total Project Cost
$436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.