SH 58 over US 95 IC

3.5 N. WORLEY · County 055, Idaho · Built 2008 · 2 Lanes · 3,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000014903
Year Built
2008
Length
165.8 m (544 ft)
Max Span
26.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
3,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.