SH 55 over McLEOD WAY
13.7 NW BOISE WCL · County 015, Idaho · Built 2024 · 2 Lanes · 10,500 vehicles/day
Overall
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.800339, -116.265078
This bridge is in worse condition than 0% of bridges in County 015. The average bridge in Idaho is 0 years old; this one is 2 years old.
Nearby Bridges
ECHANOVE RD over CURRANT CREEK
Built 2002
BROKEN HORN ROAD over DRY CREEK
Built 1987
SPRING CREEK WAY over DRY CREEK
Built 2021
SHAFER CREEK ROAD over SHAFER CREEK
Built 1997
SMA3778;DRY CRK RD over DRY CREEK
Built 2006
SH 55 over DRY CREEK
Built 1997
N. HUMPHREYS WAY over DRY CREEK
Built 2005
BROOKSIDE LANE over DRY CREEK
Built 1994
SMA 7028;BEACON LT over DRY CREEK CANAL
Built 1991
N. HOLL DRIVE over FARMERS UNION CANAL
Built 1979
Bridge Details
- Structure #
- 000000000014758
- Year Built
- 2024
- Length
- 20.1 m (65.9 ft)
- Max Span
- 20.1 m
- Width
- 29.2 m (95.8 ft)
- Lanes
- 2
- Daily Traffic
- 10,500
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.