SH 51 over BRUNEAU RIVER

0.8 W. BRUNEAU · County 073, Idaho · Built 1955 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000014545
Year Built
1955
Length
32 m (105 ft)
Max Span
10.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$904,000
Total Project Cost
$1,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.