SH 33 over TETON CREEK

1.1 S. DRIGGS · County 081, Idaho · Built 1979 · 2 Lanes · 11,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013965
Year Built
1979
Length
16.5 m (54.1 ft)
Max Span
7.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
11,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$602,000
Total Project Cost
$903,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.