US 30 over TWIN FALLS MAIN CANAL

8.9 E. HANSEN · County 083, Idaho · Built 2011 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000013656
Year Built
2011
Length
46.3 m (151.9 ft)
Max Span
22.6 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
2,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.