US 20 over BIG LOST RIVER

16.4 E. ARCO · County 023, Idaho · Built 1977 · 2 Lanes · 2,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

43.548636, -113.006753

This bridge is in worse condition than 6.3% of bridges in County 023. The average bridge in Idaho is 0 years old; this one is 49 years old.

Nearby Bridges

Bridge Details

Structure #
000000000013200
Year Built
1977
Length
18.6 m (61 ft)
Max Span
17.7 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
2,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$607,000
Total Project Cost
$911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.