SH 21 over MORES CR; DUNNIGAN CR

12.4 E. BOISE · County 015, Idaho · Built 2008 · 2 Lanes · 2,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000012826
Year Built
2008
Length
34.4 m (112.9 ft)
Max Span
33.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
2,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.