US 20 over GARFIELD UCON CANAL

1.4 S. RIGBY · County 051, Idaho · Built 1972 · 4 Lanes · 34,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000012420
Year Built
1972
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
45.7 m (149.9 ft)
Lanes
4
Daily Traffic
34,500
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.