US 20 over SMA 7096;RIVERSIDE DR.IC
IN IDAHO FALLS;RIVERSIDE · County 019, Idaho · Built 1969 · 4 Lanes · 38,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.508686, -112.046967
This bridge is in worse condition than 78.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 57 years old.
Nearby Bridges
US 20 over PORTER CANAL
Built 1966
US 20 EBL & WBL over SNAKE R.;JOHNS HOLE BR.
Built 1966
TAYLOR ST/LANDBANK over PORTER CANAL
Built 1965
US 20 WBL & EBL over SMA 7076;LINDSAY BLVD.IC
Built 1966
US 20 over I 15 NB-SB;JOHNS HOLE IC
Built 1962
US 20 WBL over S7046;UPRR;SCNCE CTR IC
Built 1970
US 20 EBL over S7046;UPRR;SCNCE CTR IC
Built 1987
US 20 over UPRR
Built 1966
I 15 NBL over I 15B;BROADWAY ST.IC
Built 1962
I 15 SBL over I 15B;BROADWAY ST.IC
Built 1962
Bridge Details
- Structure #
- 000000000012340
- Year Built
- 1969
- Reconstructed
- 1989
- Length
- 48.8 m (160.1 ft)
- Max Span
- 28.7 m
- Width
- 24.2 m (79.4 ft)
- Lanes
- 4
- Daily Traffic
- 38,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,545,000
- Total Project Cost
- $2,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.