I 15 SBL over GIBSON CANAL

5.5 S. BLACKFOOT · County 011, Idaho · Built 1959 · 2 Lanes · 13,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000011420
Year Built
1959
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
13,750
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.