US 12 over CLEARWATER R.(KAMIAH BR)
IN KAMIAH · County 061, Idaho · Built 1998 · 2 Lanes · 4,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.231206, -116.017394
This bridge is in worse condition than 81% of bridges in County 061. The average bridge in Idaho is 0 years old; this one is 28 years old.
Nearby Bridges
HILL STREET over LAWYER CREEK
Built 1972
NICHOLES ROAD over LAWYER CREEK;SW.KAMIAH B
Built 1950
SH 162 over LAWYERS CANYON CREEK
Built 2002
SH 162 over SEVEN MILE CREEK
Built 1949
SH 162 over SEVEN MILE CREEK
Built 1997
LOLO CREEK ROAD over LOLO CREEK
Built 1981
SH 13 over M.FK.CLEARWATER RIVER
Built 1994
SH 13B over M.F.CLWATER R.;E.KOOSKIA
Built 1935
B AVE over S. FORK CLEARWATER
Built 1963
US 12 over MAGGIE CREEK
Built 2018
Bridge Details
- Structure #
- 000000000010426
- Year Built
- 1998
- Length
- 204.8 m (671.9 ft)
- Max Span
- 36.3 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,560,000
- Total Project Cost
- $11,340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.