SH 8 over BEAR CREEK

2.0 W. DEARY · County 057, Idaho · Built 1968 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010245
Year Built
1968
Length
30.5 m (100.1 ft)
Max Span
12.2 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.