RANGE ROAD over SIPHON PIPE
BETWEEN STORAGE 39 & 40 · County 003, Hawaii · Built 1969 · 1 Lanes · 2 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
21.450619, -157.9968
This bridge is in worse condition than 16% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 57 years old.
Nearby Bridges
RANGE ROAD over KIPAPA STREAM
Built 1969
FAI-H2 over KIPAPA STRM
Built 1975
PLANTATION ROAD over KIPAPA STREAM
Built 1923
ANANIA DR over ANANIA DR/WAIAHOLE DITCH
Built 1973
FAI-H2 over 2-132"" STRUC.P DRN CULVT
Built 1975
MEHEULA PKWY RD over FAI-H2(MEHEULA PKWY RD)
Built 1973
MEHEULA PKWY over DRAINAGE DITCH
Built 1974
WAINIHI ST. over WAINIHI ST/WAIPIO CHL #1
Built 1957
MILILANI MEM PK RD over FAI-H2(MILILANI ACC RD)
Built 1972
KUAHEALANI AVE. over DRAIN CHNL
Built 1974
Bridge Details
- Structure #
- DAPPACKIP000057
- Year Built
- 1969
- Length
- 18.9 m (62 ft)
- Max Span
- 18.3 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 2
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.