HALEHAKA STREET over MANUWAI CANAL
0.1 KM NE OF KUNTZ AVE · County 003, Hawaii · Built 1944 · 2 Lanes · 750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
21.335603, -157.935044
This bridge is in worse condition than 81.7% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 82 years old.
Nearby Bridges
RAMP 92 EB1A over PH MAKAI FR-PH INT #7
Built 1975
MAKAI FRONTAGE RD over PH RAMP EN-PH INT #4
Built 1974
NIMITZ HWY N-PI over RAMP/HICKAM R-N-PI
Built 1979
VANDENBURG BLVD over OMALLEY BLVD
Built 1976
NIMITZ HWY R-PW over RAMP/HICKAM R-PW
Built 1979
RAMP ""NW"" over FAI-H1-PH INT #6
Built 1974
99SB 23A over PH RAMP WN-PH I.C. #3
Built 1975
MAUKA FRONTAGE RD over FAI-H1 UP-PH INT #2
Built 1975
FAI-H1(O.B.) over RAMP MN EN-PH INT #5
Built 1974
Ramp SP over Ramp GP
Built 1994
Bridge Details
- Structure #
- 1HI85110
- Year Built
- 1944
- Reconstructed
- 1956
- Length
- 14.6 m (47.9 ft)
- Max Span
- 6.9 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 750
- Material
- Concrete
- Design
- Slab
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $65,000
- Total Project Cost
- $161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.